What has to be retrofitted before 2030, building by building
Extremadura has just set its housing roadmap to 2030: €951 million, 49 measures and more than €127 million for retrofitting and urban regeneration. Delivering it comes down to a very concrete question: which buildings, in what order, and with what measurable result.
This page joins two public datasets that lived apart until now — the Cadastre and the regional register of energy performance certificates — over the 603,951 buildings of Badajoz and Cáceres. It estimates nothing: it cross-references. And on top it lays out the path technicians already use in Vega to go from diagnosis to the compliance report.
- 603,951
- buildings in the Cadastre
- 84 %
- built before the first CTE (2006)
- 77,490
- energy performance certificates on the register
- 74 %
- of what is certified is E, F or G
447,599 residential · 658,659 dwellings
44 % with no insulation requirement at all (before 1980)
Regional register · cut-off 15/01/2026 · 387 municipalities
38,924 plots with at least one certificate
The map, with the certificate lens
It opens on Almendralejo. Each plot carries the worst letter on record; grey plots have no certificate. Switch to “Norma” to see what the law required when each building was built, or search for your municipality.
Certificados E, F o G, por municipio
Cargando el registro de certificados…
Acércate a un municipio para ver cada parcela certificada.
Certificates are issued on sale or rental; there is no obligation to certify the whole stock, so what is painted is what has been certified, not the state of every building. 30 % of the register's rows carry only the letter, with no consumption or emissions. Matching is by plot (14 characters of the cadastral reference); in Almendralejo 95 % of certified plots match.
What is known today, without asking anyone
- 1Where the pre-regulation stock is, municipality by municipality and plot by plot, with its year, storeys and use according to the Cadastre.
- 2What letter the certified stock has and how it splits by construction period: in Almendralejo, of certified dwellings built before 2000, between 89 and 95 % are E, F or G.
- 3For any building, its X-ray: deduced envelope, U-values, demand, CTE climate and the three interventions that change the result most, with the provenance of every figure.
What could be known every month once the Plan is running
None of this exists yet: it is what Vega can measure if retrofit files go through a common tool. We say it this way so it is not confused with the section above.
- 1Dwellings served per programme and municipality, and which intervention was made in each (roof, façade, openings, generation).
- 2kWh of demand avoided and tonnes of operational CO₂ avoided, calculated with the same engine that justifies DB-HE, not declared by hand.
- 3Embodied carbon of the intervention with each material's source EPD, and a warning when the data is not of good quality.
- 4Euros of aid per kWh saved and per tonne avoided: the yardstick to decide where the Plan's next euro yields most.
The technician's path, without friction
All of this is live and used today. It is what would remove friction for whoever has to justify hundreds of retrofits in four years.
- 01
X-ray by address
Address → 3D building from the Cadastre, real sun, U-values by period, demand and the interventions that change the result most. No account needed.
Open the X-ray - 02
Choose the system with its EPD
Thermos and the comparator: U-value against the zone's CTE limit, embodied carbon with the source environmental declaration and a warning when two figures cannot be subtracted.
Open the comparator - 03
HE + Carbon: the report
From the IFC or the sketch to HE0/HE1/HE4/HE5 verification with EnergyPlus and the official climate, the compliance plan and the DB-HE justification report.
Open HE + Carbon - 04
DB-HSA: the building's carbon
The global warming potential justification the new Basic Document asks for, with the template and the 50-year calculation by chapter.
See the DB-HSA template - 05
EPDs in one place
The materials directory with verified environmental declarations, validity and data quality; and the way for a manufacturer to upload theirs.
See the materials
For whoever has to deliver the Plan
Descarboniza does not decide who gets a grant nor manages public money. It puts the data and the calculation in front of the technician and the administration, with provenance, so deciding costs less and can be measured afterwards. If this is useful to a town council, a retrofit office or the regional government, we want to show it with their municipality on screen.
Write to us