arquitectura
Waugh Thistleton Architects
Londres, Reino Unido
British studio founded in 1997 by Andrew Waugh and Anthony Thistleton, based in Shoreditch (London) and specialising in engineered timber since 2003. In 2009 they completed Murray Grove (Stadthaus), the world's first nine-storey solid timber building, with load-bearing walls, floors and staircases in CLT, which avoided 125 tonnes of carbon and stores more than 180. They later built Dalston Works, for a time the largest CLT building in the world. Their work drove forward the international tall timber movement.
- Category
- Architecture
- Region
- Londres, Reino Unido
- Official website
- waughthistleton.com
Why we chose it
Because they got tall timber construction off the ground and show, project by project, the carbon avoided compared with concrete.
Chosen by Descarboniza. No company pays for what we say about it. How we measure →

Sign up to see the technical analysis and our experts' opinion.
Proyectos asociados · 2

The Black & White Building
Londres, Reino Unido
Edificio de oficinas de madera maciza en Shoreditch (Londres), con estructura de LVL de haya y CLT, diseñado para desmontaje y reutilización futura.

Murray Grove (Stadthaus)
Londres, Reino Unido
Edificio residencial de nueve plantas en Londres, pionero mundial en construirse íntegramente con paneles prefabricados de CLT.
Frequently asked questions
- Where is Waugh Thistleton Architects located?
- Waugh Thistleton Architects is based in Londres, Reino Unido.
- Why is Waugh Thistleton Architects in the Descarboniza directory?
- Because they got tall timber construction off the ground and show, project by project, the carbon avoided compared with concrete.


